Member Gallery
Likes: 2
Note that the sidewalk and the floor in the front alcove are not part of the kit.
Likes: 2
As is typical of these buildings, only the walls viewable from the street are painted. The rest are plain brick. The bracing for the top of the front wall is not part of the kit, nor is the access hatch.